Kitchen Remodeling · Tampa, FL

Kitchen remodel cost in Tampa, FL.

The Tampa market averages are on this page, with their source. They are not our quote. A kitchen remodel cost without a walkthrough is a guess, and a guess is what moves later. What we can give you is better. The 3 questions that put any kitchen in a range, and what a low bid is quietly cutting.

Call or text (813) 819-6778.

A kitchen under renovation with a ladder and bare walls, kitchen remodel cost
Two quotes for the same kitchen can be half of each other. The difference is in what one of them left out.

What a low bid is cutting.

Two quotes for the same kitchen come in far apart. The cheap one is not magic. It left things out, and you find them later as extras. Here is what to look for in any quote, including ours.

A room in the middle of a home renovation with tools and bare walls, kitchen remodel cost
01

The wall repair behind the old cabinets

Old boxes come off and take drywall with them. A low bid assumes the wall is fine. It rarely is. Patching, priming and sometimes new drywall show up later as an extra. Ask if wall repair is a line, and what it covers.

02

Plumbing and electrical

Moving a sink, a range, or adding an outlet brings in a licensed general contractor we work with. Maplex Services is not a general contractor. A low bid may leave them out, or hope you will not notice. Ask which trades are in the number, and who pulls the permit.

03

Everything around the boxes

Crown molding, end panels, fillers, toe kicks, light rail, the backsplash. A bid that prices only boxes and counters looks cheap for a reason. It is missing the parts that make a kitchen look finished.

04

Haul away, protection and cleanup

Someone carries the old kitchen out. Someone covers your floors and seals the doorways. Someone cleans up every day. These are hours. A low bid either skipped them or will bill them.

The 3 questions that put you in a range.

The Tampa averages above are a starting point, not a promise. But 3 questions decide where any kitchen lands. You can answer them before you call.

01

Does anything move?

Same layout with new finishes is the smallest kitchen job. Move the sink, the range or a wall and the job doubles in trades and in days. This one question moves the number more than any finish choice.

02

Boxes, fronts or doors?

New doors are the cheapest change. Refacing is the middle. New cabinets are the top. Each step up costs more and waits longer. Pick the one your boxes need, not the one the showroom leads with.

03

Stone, or something lighter?

A stone counter is a big line. It brings a template, a fabricator and plumbing work. Laminate or solid surface skip most of that. The counter you choose changes the number and the calendar.

04

The fourth question, which is ours

What is behind the wall and under the sink. We cannot answer it from your kitchen table. We can answer it at the walkthrough. That is why our number comes after we have seen the room.

What Tampa homeowners pay for a kitchen, on average.

These are market averages for Tampa, from Angi, updated July 2026. They are not our quote. They show where most kitchen jobs land before anyone has seen your house.

01

Kitchen renovation in Tampa

$14,700 to $40,900 for most kitchens, by Angi's Tampa data. Cabinets are the biggest line inside that range. Counters and the floor come next.

02

What pushes a kitchen past $40,900

Moving the sink or the stove, taking out a wall, custom cabinets and stone counters. Each one adds a trade and a permit. The scope names them before the price.

03

What keeps it under $14,700

Refacing the boxes you have, new doors and hardware, a new counter on old cabinets. Same kitchen, less demolition. The refacing and door pages explain each one.

A whole kitchen with moved plumbing lands above these ranges. New doors on good boxes lands below. The 3 questions below tell you which way yours leans. Your written number comes after the walkthrough.

Source: Angi, house renovation cost in Tampa, FL, updated July 6, 2026. Market figures, not a Maplex quote.

What happens before the first box goes in.

The price is written before the work starts. These are the things that get settled first, because they are what make the number hold.

A sunlit interior with the wood framing exposed before the walls close, kitchen remodel cost
01

A walkthrough of the real room

We measure the room and open the sink base. We look at the wall behind the range and check the floor for level. It takes about an hour. Everything in the scope comes from that hour, not from a photo.

02

A written scope, line by line

Every part of the job is listed. What is in, what is not, and which parts the licensed general contractor we work with does. The not in list is the honest part. It is what keeps the price from moving later.

03

One closed price

One number for the written scope. It does not move unless you change the scope. If you add a thing, the change is priced in writing before it happens. That is the whole method.

04

Milestones tied to stages you can see

Payments are tied to stages. Signing, rough work done and inspected, finishes on, final walkthrough. You pay for what you can see. Nobody pays for a promise.

05

The order dates

Cabinets, counters and appliances all have lead times set by their makers. The scope lists the dates. The job is scheduled around the longest one, so nothing sits torn out waiting for a box.

What is included, and where it ends.

Every kitchen scope on this site says where it stops. These are the boundaries we put in writing before anyone starts.

Included in the scope
·A walkthrough and a written scope before any number
·Protection of the floors and the rest of the house
·Removal and haul away of what comes out
·Wall repair behind and beside the old cabinets, named
·Cabinets, counters and trim as listed, piece by piece
·A licensed general contractor we work with, named for electrical, AC and plumbing
·Daily cleanup and a final walkthrough together
Named separately, never assumed
·Appliances. You buy them where you like. We plan the cabinets around them.
·Flooring, unless the scope says so. A new layout can uncover bare floor.
·Hidden damage, priced only after it is visible, never guessed.
·Permit fees, listed as their own line, at cost.
·Fixture and finish purchases beyond the written allowances.

How long the kitchen is out of use.

It depends on what moves and what is ordered. Doors only, the kitchen works the whole time. A reface takes days, with the sink working. New cabinets and a stone counter put the kitchen down for longer. It is out from tear out until the counter is set and the sink is back. The wait for the slab is most of that. Your scope has the dates, with the makers' lead times in it.

01
Walkthrough and written scope
02
Orders placed, lead times set by the makers
03
Tear out, protection up
04
Wall repair, then plumbing and electrical rough by the general contractor we work with
05
Cabinets set
06
Counter templated, cut and set
07
Backsplash, trim and hardware
08
Final walkthrough together

When we tell you not to do it

A kitchen remodel is the biggest number in most houses. That makes it easy to sell to someone who should wait. So we say no in the cases below, and we say why.

The budget covers the showroom, not the work

If the number in your head is the cabinet quote from a store, it is half a kitchen. Tear out, walls, trades, counters and trim are the other half. Wait, save the rest, and do it once.

The house is going on the market

A full kitchen rarely returns its cost at sale. New doors, paint and hardware often do. We would rather point you at the small job than sell you the big one.

You have not decided the layout

Ordering cabinets before the layout is settled means ordering twice. Settle the layout with the licensed general contractor we work with in the room. Then order. The cheapest change is the one made on paper.

The problem is one broken thing

A dead dishwasher, a cracked tile, a door that sags. Fix the one thing. A remodel is not the answer to a repair, and we do repairs too.

An older kitchen with oak cabinets and tile counters, the point where refacing or replacing gets decided

Lifetime warranty on our workmanship.

If the work we did fails, we come back and fix it. That holds for as long as you own the home. On a full kitchen it covers what we built and set. The boxes, the trim, the wall repair and the counter set.

What the warranty covers
·Cabinets staying level, plumb and fixed to the wall.
·Trim, fillers, panels and toe kicks we installed.
·Wall repair we made, and whether it held.
·The counter seam, level and support we built.
What it does not cover, said here and not in a footnote
·The products themselves. Cabinets, stone, appliances and fixtures carry their makers' warranties, and we hand you that paper.
·Work done by the licensed general contractor we work with. It carries its own warranty and is named in the scope.
·Water damage after the job, from a leak or an appliance.
·Wear, chips and scratches from use.
·Anything we were not allowed to open or repair, and what it does later.

A warranty is only worth what its exclusions say. Ours are above, in the same size type as the promise. Ask whoever you are talking to how long theirs runs, and get the number in writing.

Questions we actually get asked

Is an estimate the same as a quote?

Not always, and the difference costs money. An estimate is a guess and it can move. A quote is a price for named work. What we give you is a written scope with one closed price. Ask any kitchen company which of the two you are holding.

Is the range on this page my price?

No. It is the Tampa market average from a public source, with its date. It tells you what most people paid. It cannot see your house. We give you a number after an hour in your kitchen. It is a real one, and it holds.

Do you charge by the hour?

Never. Every kitchen is priced by written scope. An hourly price gives you no number to plan around, and nobody a reason to finish.

What makes the price go up after signing?

Only a change you ask for, or hidden damage we could not see. A change is priced in writing before it happens. Hidden damage is priced only after it is visible. Nothing else moves the number.

Can I do the kitchen in stages?

Yes, and it is often smart. Doors and paint now, counters next year, layout later. Each stage is its own scope. The only trap is ordering cabinets before a layout change, which means buying them twice.

Is the walkthrough free?

Yes. It is how we get to a real number. It takes about an hour, and you get the written scope after it. There is no charge and no obligation.

The other kitchen services

White cabinets with even door gaps and a tile backsplash, kitchen cabinet installation Kitchen cabinet installation New boxes, set level on a wall that is not. Gray slab cabinet fronts and new handles, kitchen cabinet refacing Kitchen cabinet refacing The boxes stay. Everything you see changes. Close up of new white cabinet doors and black handles, cabinet door replacement Kitchen cabinet door replacement The cheapest change, and the easiest to order wrong. Granite counter and undermount sink on white cabinets, kitchen countertop installation Kitchen countertop installation Cut once. The template decides everything.

All five kitchen services

Where we work

Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties. If your town is not on this list, call and ask: the answer is often yes.

Tampa Brandon Riverview Valrico Seffner Ruskin Apollo Beach Plant City Temple Terrace Lutz St. Petersburg Clearwater Largo Seminole Palm Harbor Safety Harbor Oldsmar St. Pete Beach Wesley Chapel New Port Richey

A walkthrough, then a written scope with one closed price.

Never hourly, never a verbal figure, and our workmanship carries a lifetime warranty. Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties.

See a sample scope document