Bathroom Remodeling · Tampa, FL

Walk-in shower in Tampa, FL, low curb or none.

Most of Florida sits on a concrete slab with nothing underneath it. That single fact decides what the curbless shower in your saved photo will cost. In some houses it is a straightforward job. In others it is a concrete saw. Almost nobody tells you which before you have paid for a design.

Call or text (813) 819-6778.

Walk-in shower with a low curb, a matte black grab bar and a sliding glass door
A walk-in shower built in the footprint of the old alcove. It has a low curb, a grab bar and a hand shower on a slide bar.

Curbless on a slab: the three ways, and what each one costs you.

Water leaves a shower by falling. For a curbless shower the drain has to sit below the floor around it. On a slab there is nothing below. There are exactly three ways out of that. The brochures show you the result and never tell you which one it took.

A white tiled walk in shower with no curb, walk in shower
01

Cut the slab

The concrete is opened so the pan and drain sit low enough. This is the honest curbless answer, and the expensive one. It brings in a licensed general contractor we work with. It also adds an inspection and a wait in the middle of your job. Every dollar of it disappears under the tile, where nobody will ever admire it.

02

Raise the bathroom floor

Instead of going down, the whole floor comes up. It sounds cheaper and often is not. It moves the door, the threshold and sometimes the vanity. You end up with a step at the bathroom door instead of at the shower. You have moved the step, not removed it.

03

A low curb instead

Not curbless, but a step of a few inches instead of a bathtub wall. For most households this is the honest answer. You get nearly all of the benefit and none of the slab work. We will say so even though it is the smaller job.

What moves the price once the curb is decided.

The curb is the big fork in the road, but it is not the only thing in the number. These three are what separate two quotes for the same shower.

01

Whether the drain moves

If the new shower keeps the old drain where it is, this is a much smaller job. Moving it means opening the floor. On a slab that brings in a licensed general contractor we work with, a permit and a wait.

02

How the waterproofing is done

There is more than one system, and they do not cost the same. A sheet membrane, a liquid applied one, and a bonded tray each behave differently at the drain. The scope names which one, so you can compare two quotes that look alike.

03

The size, and then the glass

A shower has to give you at least 900 square inches inside. It also has to be at least 30 inches across at its narrowest. That is the floor the code sets, not the target. Past that, the glass is what moves the number.

How much lower is the step, exactly?

This is the whole reason for the job, so it deserves real numbers instead of the word easier.

Close up of a round shower drain cover, walk in shower
14 to 16 in

A standard bathtub wall

What somebody is climbing over today, several times a day.

4 to 6 in

A tiled low curb

The usual result, and the difference people notice the first morning.

0 in

Fully curbless

Only with slab work or a raised floor. Real, and worth it when somebody genuinely needs it.

What is included, and where it ends.

A written scope is only worth something if it says where it stops. These are the boundaries we put in writing before anyone starts.

Included in the scope
·Demolition and haul-away of the existing shower or tub
·Framing, blocking and backer board made sound
·Waterproofing membrane, seams and corners banded
·Pan built to fall correctly toward the drain
·Blocking behind the wall for grab bars, set before the tile
·Tile, glass panel or sliding door, installed and sealed
·Maplex Services is not a general contractor. Electrical, AC and plumbing go to a licensed general contractor we work with, who pulls the permit
Named separately, never assumed
·Grab bars and a bench are named in the scope if you want them. The blocking behind the wall goes in the scope too. Blocking has to happen before the tile, so it is decided early or not at all.
·The scope says whether the door swing or the threshold changes. On a raised floor it usually does.
·Slip rating of the floor tile is named in the scope. It is the one specification people skip and then regret.

How long the bathroom is out of use.

This job has more sequence in it than a straight shower replacement. The pan has to be built and proved before anything decorative happens. If the slab is opened, a licensed general contractor we work with comes in, then an inspection. Your written scope carries the dates.

01
Demolition and haul-away
02
Slab or floor work, with plumbing by a licensed general contractor we work with
03
Pan built to fall toward the drain
04
Waterproofing, then cure
05
Tile, grout, then cure
06
Glass, grab bars and walkthrough, fixtures by the general contractor we work with

When we tell you not to do it

Every company on your list will say yes to this job. These are the times we tell you to wait, or to pick a different shower. It costs us the odd project, and it saves you a lot more than that.

You want curbless purely for the look

Say nobody in the house has a mobility reason for it. Then a low curb gives you nearly the same room, tile and glass. It costs a lot less. And it keeps your budget above the floor, where you can see it.

The bathroom is upstairs with a shallow joist bay

There is not always enough depth to drop a pan and still have fall. That is a framing question and it gets answered before you pay for anything.

You need it certified to an accessibility standard

Aging in place and formally accessible are not the same thing. If a specific clearance has to be met on paper, say so up front. It changes the layout and sometimes the room.

Shower walls with the waterproofing membrane and every seam banded, Tampa, FL bathroom remodel

Lifetime warranty on our workmanship.

If the work we did fails, we come back and fix it. That holds for as long as you own the home. Not one year. Not five. As long as you live there.

What the warranty covers
·The waterproofing and how it was detailed
·The tile setting, the layout and the grout joints
·The pan, the fall and the way water leaves the shower
·The fit and finish of what we installed
What it does not cover, said here and not in a footnote
·The products themselves. A valve, a pan or a glass panel carries its own maker warranty, and we hand you that paperwork.
·Normal wear. Grout and silicone are maintenance items and they age.
·Accidental damage, and anything a later trade or a later owner does to the work.

A warranty is only worth what its exclusions say. Ours are above, in the same size type as the promise. Ask any other company for theirs in writing. Then check how long the tile is covered.

Questions we actually get asked

Is curbless always better?

No. It is better when somebody needs it, and it helps for aging in place. For everyone else a low curb does most of the same job for less. The expensive part of curbless is under the tile, where nobody can see it.

Will a curbless shower flood the bathroom?

Not when the fall is built correctly and the glass is placed to keep spray in. Water goes where the floor sends it. That is why the pan is built and checked before tile. It is also why the fall is not something to eyeball.

Can you add grab bars later?

Only into blocking that already exists. Blocking is cheap while the wall is open and expensive once it is tiled. So if there is any chance you will want bars, we put the blocking in now. You add the bars whenever you like.

What about the shower floor tile?

Small tile with more grout lines gives more grip. It also follows a four way fall more easily. That is why shower pans usually get mosaic. If slip resistance matters to you, the rating is named in the scope.

Is a walk-in shower the same as a walk-in tub?

No. A walk-in tub is a bathtub with a door in the side. It is a different product, with different plumbing and a different price. If that is what you are looking for, say so at the walkthrough.

The other bathroom services

A finished bathroom in Tampa, FL with a new vanity and tiled walls Bathtub reglazing and repair A coating, not a new tub. It lives or dies on the preparation. Walk-in shower built in a former bathtub alcove Tub to shower conversion The drain decides whether this is 4 days or a cut in the slab. Shower walls in waterproofing membrane before tile, Tampa, FL bathroom remodel Shower replacement Already have a shower and it is failing behind the tile. A newly set bathtub with a tiled surround Bathtub replacement Keeping a tub, just not this one. Compact bathroom with tile carried up the wall Small bathroom and guest bath The whole room, when it is the compact one. Master bathroom with a walk-in shower and double vanity Master bathroom The whole room, when it is the big one. A finished bathroom remodel in Tampa, FL with tiled walls and a new vanity What a bathroom costs in Tampa, FL The three things that move any bathroom between ranges.

All eight bathroom services

Where we work

Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties. If your town is not on this list, call and ask: the answer is often yes.

Tampa Brandon Riverview Valrico Seffner Ruskin Apollo Beach Plant City Temple Terrace Lutz St. Petersburg Clearwater Largo Seminole Palm Harbor Safety Harbor Oldsmar St. Pete Beach Wesley Chapel New Port Richey

A walkthrough, then a written scope with one closed price.

Never hourly, never a verbal figure, and our workmanship carries a lifetime warranty. Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties.

See a sample scope document